This is an email exchange recently between me and a developer/contractor. Back story is they called us up a few months ago, looking for some budgeting on a couple buildings they had coming up. The guy apparently knew my uncle down in Calgary, as well (uncle said he remembered the guy, thought he was alright but hadn"t ever gotten any work from him). We said sure, no problem, it takes only an hour or two to do a suite/bathroom count and compare it to past similar jobs to cook up a budget that"s within 5-10%.
A month or two later the same guy calls and says they have the final drawings for the project, and he needs a price in a week. I tell him we"re in the middle of tendering 3 or 4 other projects, and it will be really difficult to turn it around so quick. I ask him if we can have until the end of the following week, he insists no later than the middle, or about 8-9 days. I specifically asked him if any promises had been made to anyone, and why they were calling us if our competition had done a decent job on the last project, that budget should have been a decent check price etc and he reassures me that if we our price is legitimately low, we"ll have the job. So we proceed to invite subtrades, request pricing on fixtures and equipment, and spend a week tendering the project.
The day after we close it, I call to ask how things turned out. Dude is evasive, saying he hasn"t looked at the mechanical numbers yet, but he"ll get back to us as soon as he has. Another couple days pass, I call again and ask how things are looking. Again, non-committal. The next week I find out through a subtrade that our competition, who did the last project for these guys, has only just then started to call subtrades and suppliers for pricing, two full weeks after we were forced in to tendering it "ASAP." I call him again, and pointedly ask him why that was the case, that it sure seemed like something fishy was going on. He say not to worry, he"d been trying to get a hold of someone at our competition for weeks and they wouldn"t return his calls, he was pissed at them too, we"ll still be given a fair shake.
Then one morning the little fucking coward sends me this email:
Weasel said:
Please accept my sincere apology, unbeknown to me at the time and before my arrival here at Acme Fuckheads, a deal had been struck with Shit Work Mechanical to provide firm pricing for all Fuckhead projects in Edmonton for 2012. Had I known this at the time, I wouldn't have asked you for a quote. This was only revealed to me in a meeting yesterday, when I complained about no pricing from Shit Work Mechanical. It would have been nice working with you, as I have worked with (Uncle) here in Calgary in the past.
This was a slap in the face for many reasons, first of all because he didn"t even have the balls to call me directly. Second of all because his corporate title was "Chief Estimator", so I doubt he wasn"t aware of the arrangement, and if he was he"s a fucking moron. Third because we called our competition and they told us that they"d had a contract in place on the project for months, and as far as they could recall it had the Weasel"s name on it, so he was flat out lying. Fourth because it costs $5,000-15,000 for me to bid a job in terms of my time and my estimator"s time, drawing reproduction, and the like. To say nothing of the similar costs my subcontractors incur, or the lost opportunity in passing up other work we could have bid.
My reply:
Me said:
To say that I am disappointed would be a massive understatement. Irate, furious and disgusted would be closer. I specifically asked you several times in separate conversations whether you only needed a check price, if there were any existing arrangements or promises made, and if (my company) would have a legitimate chance at being awarded these projects price depending. You assured me that no promises had been made and that we would be given a fair shot. I asked why we were being asked to price the project, if Shitty Work Mechanical had just completed several other buildings, and you assured me that while they had done an okay job that Fuckheads was looking to potentially "shake" trades up. Further, you dangled the carrot of 3 other buildings coming up after these as an enticement.
Whether through omission or intention, we were lied to about all of the above.
On top of that, we were forced to price the project in extremely short order for no apparent reason, which caused us to take a pass at several other tenders where we would have been treated fairly and honestly. My estimator and myself were tendering numerous projects at the time, working evenings and weekends, and apparently completely wasted our time based upon the assurances we were given. It took me an hour to prepare the original budget that was within 10% of our tender, which we would have been happy to prepare had we been told the truth. It took over a week to conduct a complete take-off and tender, to say nothing of the time wasted amongst our subtrades and suppliers.
I am deeply offended and disgusted at the dishonest and unethical way we have been treated by Fuckheads. This is not the way we do business, nor should anyone else.
If I ever meet him face to face, I"d at the very least get in his face, if not just punch him in the throat. Asshole.
We told our competition to jack up their price as the developer told us they were committed to them. I hope they get fucked.