Yeah, I'll likely mud over the smaller soffit and repaint. Here's a pic of the upper cabinets finished. The soffit above it is not even remotely level(the cabinets are), so I have some molding I'm going to run above the cabinets to cover that slanted gap. Working on lower cabinets this week and then flooring on the weekend.
View attachment 67246
sealed about 400 sq ft of deck. I will never stain, fuck would that be awful to get it all covered and consistent, this took about 2 hours.
Can't I still install under cabinet lights and just plug them into the outlet the microwave is in, or does the MW need to be on its own circuit?Too late now, but i would have had the electrician pull wire for under cab lights. I did when I re-did my kitchen I use them way more than I thought i would. They are great for early morning coffee making without blowing your sleepy eyes out of your skull.
Can't I still install under cabinet lights and just plug them into the outlet the microwave is in, or does the MW need to be on its own circuit?
We went with quartz. Color is similar to this:What kind of counter top ya gonna get?
Made some progress on the Tree House (err more like a fort I guess) this weekend. Up next is the railing for the stairs & then the Turbo Tube Slide will get attached. Not sure if I still want to put a roof on, just leaving the up rights long until I decide.
Will post more pics when the railing and slide are done.
Wood look tile imo, lot more work but won't show wear.
Just throw a carpet down without a pad. Easy peasy.